Roof Continues

IMG_2602

The Cee Studs continue to be installed.  This is the first phase of the roof.

 

 

 

 

 

 

IMG_4157 IMG_7834

 

 

 

 

 

 

 

IMG_8789 IMG951185

 

 

 

 

 

 

 

IMG957248