Preparing for Concrete

employee area ready to be pouredThe equipment room is ready for concrete

 

 

 

 

 

 

employee area ready to be pouredEmployee area is ready for concrete

 

 

 

 

 

 

IMG954436Installing 2×8 plates for coping cap

 

 

 

 

 

 

IMG956065

 

 

 

 

 

 

 

IMG957476 installing 2x8 plate for coping cap1

 

 

 

 

 

 

 

installing 3x3 angle around trench perimeterInstalling 3×3 angles around the perimeter of the trench

 

 

 

 

 

 

installing 3x3 angle around trench perimeter1

 

 

 

 

 

 

 

IMG950782Installing the cee track

 

 

 

 

 

 

Installing cee track

 

 

 

 

 

 

 

tunnel ready for concrete 2Tunnel is ready for concrete

 

 

 

 

 

 

tunnel ready for concrete

 

 

 

 

 

 

 

weldingWelding a plate

 

 

 

 

 

 

IMG950902 IMG954062